Meeting title (from calendar)
No agenda was uploaded for this meeting — SiteWright generated a standard set of minutes using the calendar title and connected project context.
Attendees
8 invited
Sarah Johnson
Project Manager · Northline GC
Mike Kim
Superintendent · Northline GC
David Chen
Construction Manager · Northline GC
John Davis
Owner · Riverside Holdings
Brian Smith
Steel Trade Partner · Steel Erectors
Buss Mechanical
MEP Trade · Buss Mechanical
Facade Systems
Curtain Wall · Facade Systems
City Inspector — R. Alvarez
AHJ · City of Riverside
Safety
Auto-categorized from transcriptSummary
No recordable incidents this reporting period. One near miss on Level 4 (falling materials).
SMART Action 1
- Who
- Mike Kim (Superintendent)
- What
- Publish revised fall-protection plan for Level 5 roof edge
- Measurable
- Plan submitted to owner + all trades signed daily JHA
- When
- By May 22, 2026 (5 PM)
- How
- Coordinate with steel & roofing; use OSHA 1926 Subpart M checklist
Schedule
Auto-categorized from transcriptSummary
Level 3 concrete pour slipping 2 days due to rebar delivery. Recovery plan required by Friday.
SMART Action 1
- Who
- Brian Smith (Steel Erectors)
- What
- Provide updated rebar delivery schedule for Level 4
- Measurable
- Written delivery schedule confirming ≤ 2-day slip absorbed
- When
- By May 21, 2026
- How
- Confirm with mill + trucking; escalate to owner if slip grows
Procurement & Long-Lead
Auto-categorized from transcriptSummary
480V capacity for tower hoist relocation pending electrical confirmation.
SMART Action 1
- Who
- David Chen (Central Electric)
- What
- Confirm 480V power capacity for tower hoist relocation
- Measurable
- Written capacity confirmation + one-line diagram issued
- When
- By May 18, 2026
- How
- Verify at panel MDP-2; coordinate outage window with GC
Owner Decisions
Auto-categorized from transcriptSummary
Owner approved concrete mix change (Level 3) and weekend OT on Level 2.
SMART Action 1
- Who
- John Davis (Owner)
- What
- Review alternate ceiling grid vendor pricing delta
- Measurable
- Written go/no-go decision with $ delta acknowledged
- When
- By May 24, 2026
- How
- Owner + PM review; Northline to prepare vendor comparison
RFIs & Submittals
Auto-categorized from transcriptSummary
RFI-021 (curtain wall anchor) pending architect response; needed by May 20.
SMART Action 1
- Who
- Architect of Record
- What
- Respond to RFI-021 — curtain wall anchorage at column line C
- Measurable
- Signed RFI response uploaded to Procore/Autodesk Build
- When
- By May 20, 2026
- How
- Coordinate w/ structural EOR; reference sheet A-501
Manual edit legend
Any content changed by a user is highlighted amber and tagged with a code likeM-EDIT-001.
Codes appear on-screen and in the downloaded PDF. Original AI-captured text is retained in the audit log.
Session edits: 0
Editor: Sarah Johnson
SMART minutes
Every action is captured as Specific, Measurable, Achievable, Relevant, and Time-bound — who, what, when, and how — so the record is clear and enforceable.
Compliance
Attendee statuses, edit codes, and downloads are logged for audit. Distribution-only attendees receive the PDF but are not marked as participants.